November 9,
2002 |
 |
Moving Day
finally arrives!!! Thanks to the help of 15 people, we were done by
noon moving both the apartment and the storage unit! Special thanks
to Jeremy Pell for helping prep the full day before. |
October 28,
2002 |
 |
The kitchen
countertops were installed today. Plumbing is also now complete. |
October 27,
2002 |

|
It's hard to
see, but the landscape lighting is done and turned on for the first time.
We also spent the day doing yard work - 1 1/2 hours of straight
mowing time :( |
October 4,
2002 |

|
Interior
painting continues along with ceramic tile installation. |
September
28, 2002 |



|
Landscaping is
under way. Marty (the landscaper) is seen installing the plant beds,
mulch, and accent lighting. Concrete curbing and sod is scheduled
for next week. |
September
27, 2002 |
 |
The lawn
irrigation system was installed today. The entire system was in
place and working by sunset! |
September
24, 2002 |

|
Interior work
continues with the application of paint and sub-flooring. All trim
work is nearly complete with the exception of kitchen cabinetry. The
cabinets are still being custom-built at the factory and are due in at any
time. The downspout drains were installed today and finish-grade
begun on the outside. |
September
4, 2002 |

|
Sidewalk and
driveway work begins today with the application of forms. McKinley
Foster (a.k.a. "The Best Concrete Man in the Business") can be
seen in the top photo in the back of the truck. |
September
2, 2002 |
 |
Drywall work
is now complete with crews finishing the ceiling texturing and sanding. |
August 14,
2002 |


|
Drywall is
underway on the inside and gutter application has begun outside. |
August 12,
2002 |




|
Brick is
complete (or at least 99%). Still a couple of final touches to be
done including the address block below. |
August 10, 2002
|


|
Insulation is
complete. Downstairs we installed traditional batt-style insulation,
but upstairs we used a blown-in type. The blown-in type supposedly
provides a far superior barrier. |
August 2, 2002
|

|
Bricklayers
continue their work (day 3). The bottom photo shows a close-up of
the brick color by the front stoop. Also seen is the 'year built'
block. |
August 1, 2002
|

|
Whew! The
wiring is done! I finished the phone, cable, cat5e (computer), two home
theaters, and the security system today. After running a couple of
miles (literally) of wire to 52 points of termination around the house,
I'm ready for a vacation. Thanks to Mark Culver, Candy Ashby, and
Rob Skiver for helping out. |
July 31,
2002 |
 |
The
bricklayers finally show up and begin to work. In this photo they
are just setting up. |
July 29, 2002
|





|
OUCH!
Heavy rains and high winds cause a retaining wall on
one of the window wells to collapse inward into the basement wall.
Damage was minor and will be repaired by the end of this week. The
same storm also ripped several large sections of shingle caps.
|
July 14, 2002
|



|
Top picture
shows view from living room showing dining room and entry. Our new
address is shown on the permit (3725 Highland Park Drive) and an arsonist
strikes our dumpster on July 13 at 1:13 in the morning. No damage to
the house. |
July 12, 2002
|


|
Windows and
exterior doors are installed. Shingles started and base coat of
paint applied to exterior trim. |
July 4, 2002
|

|
Most framing
is complete. Exterior trim has begun along with door and window
installations. |
June 26, 2002
|




|
Roof framing complete. Decking started
before more heavy rain halts work for the day.
|
June 25, 2002
|



|
Proof that
wood floats! Heavy rains slow progress as the basement becomes a pond and
keeps the sump pump working overtime. |
June 21, 2002
|



|
Roof framing
under way. |
June 13, 2002
|

|
Main floor
framing complete. |
June 7, 2002
|

|
Framing begins
in basement. |
June 3, 2002
|

|
Back-filling
begins. |
May 30, 2002
|
 |
Basement
foundation is complete. |
May 21, 2002
|

|
Basement walls
are poured. |
May 16, 2002
|

|
Basement is
dug and footers are poured. |
May 1, 2002
|

|
Newly
purchased lot in Highland Park. The lot is later staked on May 5,
2002 |