White River Township Fire Protection
District
Pre-Meeting
Report for July 11, 2006
Compiled July 5, 2006
- No new news on the Task Force One agreement at
this time, however the topic will be left on the agenda due to follow-up
from legal counsel expected at the meeting.
- The Engine 54 construction contract with Towers
Fire Apparatus was officially executed and the pre-build meeting is scheduled
to take place on Monday, July 17th at 9 a.m. at Headquarters. All of the non-winning bidders were
notified both in person and by correspondence of their non-winning status.
- The Station 52 project is moving along as
planned and on budget. Drywall was
hung last week and finishing began thereafter. The exterior of the structure is nearly
100% complete.
- The Station 51 project is moving along on
schedule as well. Footings and
basement walls were all poured last week with additional footings (for the
bay area) being placed this week.
Basement backfill will begin next week leading up to basement
floors and gravel drives the week after.
So far, all parties have been working flawlessly together with good
feedback and communication between the Building Team, on-site contractors,
Senefeld & Associates, and the Kramer Corporation. The project timeline is still projecting
the building to be completely enclosed by winter with substantial
completion of construction by April 30th, 2007. On-site project update meetings are held
every two weeks starting at 10:30 a.m.
The meetings last about an hour and follow with a “tour” of the
site for anyone who shows up. Hard
hats will be provided.
- Recall that this meeting will serve as the
official public hearing for the 2007 budget.
- As per request of the Board, Chief Tibbetts will
make a presentation regarding the acquisition of property in the Northwest
Quadrant of the fire district for a future fire station. The following is a synopsis of the top
four prospects (in order of cost from lowest to highest) as found through
a lengthy research process:
- 1.0 acres at 826 N. Bluff Road – $335,000 (no
water or sewer)
- 1.5 acres just north of Bluff and Fairview
intersection on west side - $400,000 (water and sewer on site)
- 1.5 acres on the west side of State Road 37 -
$450,000 (no water or sewer)
- 1.2 acres at 206 N. Bluff Road - $495,000 (No
water or sewer)
- As in years past, the department has held back
on major capital outlays until the second half of the fiscal year in case
of a substantial unexpected expense that would require cancellation of any
one project. This year, in addition
to the planned capital outlays, the department is anticipating some additional
un-budgeted projects. These
projects vary from ones already approved by the board up to and including wish-list
items that have come up since the end of last year. A recap of these projects is included
below that currently totals $663,613.00.
This list is included here just to make the board aware of these
projects. No discussion is
anticipated at this time.
- 2003 and 2004 audit of the former volunteer
corporation - $10,000
- Unpaid bill from former volunteer corporation for
Booster Club mailings - $9,000
- Additional capital required above the 2003 Fire
Loan amount for the Station 52 project - $76,393
- Station 52 workshop area cut from the original
room addition project - $4,900
- Additional mini barn for Strawberry Festival
storage and screen wall repair at Station 53 - $8,000
- Station 53 sewer connection - $100,000
- Additional capital required above the 2005 Fire
Loan amount for the Station 51 project - $350,000
- Fire sprinkler system for the Station 52 room
addition project - $9,000
- Garage structure for small vehicles and
trailers at Station 53 - $85,000
- Quantitative SCBA mask fit testing unit -
$10,000
- Garrison Flag for honor guard unit - $1,320
- That’s all for this month. See everyone at the meeting.
The next meeting is
scheduled for Tuesday, August 1st, 2006.