White River Township Fire Protection
District
Pre-Meeting
Report for April
5, 2004
Compiled March 31,
2004
- We are still meeting weekly and preparing the
Strategic Plan. The plan is about
80% complete and should be ready for distribution at the May meeting. The entire senior staff and Steve Dyson have been working diligently on this important
project.
- Chief Tibbetts accompanied members of our
department to the factory for the final inspection on Engine 51. There were a few minor errors (striping,
etc.) but once those have been addressed, it should be delivered the first
week of April. As we already have
the equipment for this truck, we anticipate it going in service no later
than April 15th.
- Out of sixty-seven applications handed out, thirty-nine
were returned for the career process.
The next phase is the CPAT (physical ability test) and will take
place the week of April 5th – 9th. The next phase after that is the written
exam phase that will take place on May 8th. Everything is progressing nicely on
schedule and on budget.
- The internal process for all current full-time
employees for a lateral move to the M-F Fire Prevention position was
conducted last month. There was one
request and that was from Lieutenant Kevin Skipper. Based
on this information, the senior staff requests that Kevin be transferred
into this role effective December 4th (when the new hires are
released to work on duty). If this
is approved, we would then hire four Lieutenants instead of three. This effectively eliminates doing an
entire separate process just for the Fire Prevention Lieutenant position.
- The receptionist process is well underway. 190 applications were picked up between
March 22 and March 26. As of the
close of the process on April 2nd at 4pm, 85 applications were
returned. Interviews will begin the
week of April 5th – 9th. A final recommendation will be made to
the District board at the May meeting.
- The 2003 Fire Loan Projects are proceeding on
schedule. The following is an
update on current and upcoming projects.
- The HURST tools and related equipment have been mounted
in the trucks. Training has been
completed on all three shifts and the tool is now in service (and used
twice already with stellar performance).
- Because of a discrepancy with IKON Office
Solutions, we have opted not to purchase the copy machine outright. The total buy out cost was
significantly more than continuing with the monthly lease payments. This was not the case when the buyout
was calculated last summer in preparation for the fire loan. Since then however that buyout has
expired and the salesman who worked up the deal has passed away. IKON refused to work with us on it.
- Pursuant to approval received at the last
District meeting, the new computer system was purchased from Dell and we
have already taken delivery of it.
Several of us are working on this very time-consuming project
daily and anticipate the new computers coming on line over the next week
or so. The server is installed but
having some issues with our virus-scanning software. We are working with McAfee on a
resolution.
- No new news on the Olive Branch property since
all the details were worked out at a meeting
earlier last month.
- Both the Station 52 and Station 53 construction
projects are underway with some of the minor repairs already being
made. Lieutenant Smith has been
working with various contractors and overseeing the cadre of
projects. Not sure what the status
is with Dudley Senefeld and the plans for the
room addition at Station 52.
- As we have mentioned before, our wireless
networking system, which is the system that links the three stations
together, continues to experience problems. The 2003 fire loan permitted for an upgrade
of our current system, however, since the fire loan package was put
together, some of the equipment is now obsolete and unavailable. After a further and much more in-depth
review, we have put together a much better alternative. We have attached a separate explanation
that explains the situation. While
we understand that it is rather lengthy, it does thoroughly explain the
problems we are experiencing and the solutions to those problems.
- After legal counsel made a decision regarding
disposal of our old computer system, we have advertised it for sale in the
local newspaper. Sealed bids are
due in to Chief Cassin by 7pm on April 5, 2004. The bids will be opened at the District
Board meeting and awarded then.
- No new news on the corporation consolidation
project other than an initial response from the attorney’s office saying
that it COULD be done! There are
some logistics that would have to be worked out though. Chief Tibbetts will hopefully have a
report at the meeting.
- I just now realized that the meeting is on a
Monday, which is a class night for me, so I will not be able to
attend. Since March just ended, I
will try to do a reconciliation of the accounts on Monday and have
something to present at the meeting.
I apologize for not getting this information to you earlier as you
requested at the last meeting, but the computer project and the two hiring
processes are taking every once of time I have right now.
- The minutes from the March 2nd
District meeting are available for viewing on our website, or by following
this link: http://www.wrtfd.org/downloads/minutes/fpdb/2004/0302.htm
- The agenda for the April 5th District
meeting is available for viewing on our website, or by following this
link: http://www.wrtfd.org/downloads/agendas/fpdb/2004/0405.htm
- This agenda will be updated as needed. Copies will be available the night of
the meeting. The Mach newsletter is
available for viewing on our website, or by following this link: http://www.wrtfd.org/downloads/newsletters/2004/Mar04news.doc
To: White River Township Fire District Board of
Directors
Re: Wireless Communication Dilemma
The
Problem:
The White River Twp. Fire Department
has been experiencing an increasingly persistent problem with our ability to
communicate effectively and efficiently with our wireless network. The
department decided several years ago to update our technology by going to a
wireless networking system that allows us to connect our three (3) stations
together on our computer network. This has allowed for increased productivity
for most of our data transmission and storage, while significantly decreasing
operational costs by not having to install and pay monthly service fees for
telephone lines between the stations.
As
with any technology, over time, it both degrades physically and becomes
obsolete as improvements in technology come about. This is our current dilemma.
It is broken down as follows:
- When our current
equipment was purchased and installed, it ran at a speed of 11 mbs/second.
This is the speed that data transmission takes place. As time has
progressed, this speed has slowed to less than half, or 5.5 mbs/sec., of
what it is supposed to be.
- When our current
system was installed, we were limited by the available technology in the
distances that the wireless signal could be transmitted between tower
sites. What was happening was that instead of having separate but equal
strength signals being transmitted from the main radio at station 53 to
both station 51 and station 52, the signals that go to station 52 are
first sent to station 51’s receiver and then retransmitted to station 52.
The same thing then happens in reverse with signals from station 52 to
station 53. Unfortunately, we have learned that when this retransmission
of a signal happens, the signal strength is cut in half. The reason is
because there are only three (3) radios being used instead of four (4).
Station 53 needs to have four (4) radios so this “halving” of the signal
strength doesn’t happen. This now brings our signal transmission speed
down to just over 2 mbs/second. The result of this speed problem is that
when a user simply wants to log onto the system, the wait to just get into
the system for use can take as much as 10 minutes or more when there are
other user already on the system. This is very frustrating to say the
least.
- The radio equipment
that we are currently using in our wireless system is obsolete. Another
problem that we have discovered is that the power supply units for each of
the existing radios have degraded in their ability to give full power to
the radios. This is common and expected over years of continual use.
However, the power supply units are no longer available for these radios.
We have tried to find replacement power supplies for these, both on our
own and through our wireless network contractor without any success. They
simply are not available anymore. The end result of this is that as the
radios fail to get the full power that they require, they fail to send out
the radio signals at full strength. This cuts our already severely
compromised radio signals even further, to just around 1 mb/second.
- Interference. Our
current system is not the only one in use in the area. The Center Grove
School Corporation also has a wireless network running between all of its
facilities. We all use radio frequencies that are very close together. As
the use of this wireless technology increases with other businesses and home
networks, this can cause interference, or what is commonly referred to as
“a trashy signal”, which even further degrades the radio signal.
- To compound these
frustrations even further, imagine that it is 3 o’clock in the morning and
you’ve just returned from an emergency medical response. It took you 30
minutes from dispatch to backing in the fire station to complete the run.
You now sit down at the computer terminal at station 52 (our busiest
station for runs) to enter your run report. What should take no more than
15 to 20 minutes can literally take an hour and a half to enter because of
the dramatically s-l-o-w speed of the current system. If this occurs 4 or
5 times (the average) a day, you can understand why our personnel are very
frustrated.
The
Solution:
We
have met with a new wireless communications vendor, Wireless Networking
Solutions, Inc. They are highly recommended and have installed and maintained
several wireless systems, large and small, throughout Indiana. They are pro’s
at what they do. They have assisted us in troubleshooting our current speed
problems to come up with solutions. The following is a synopsis of these:
- We have to do
something about our power supply problem with our current radios. It will
be sooner rather than later that one will completely fail. If that failure
occurs at station 53, we will be totally incapable of communicating with
either of the other stations. The short version of this is that we need to
replace the current radios that we are using. Additionally, we need to install
a 4th radio into the network This will allow full strength
signals to be simultaneously transmitted between station 53 to and from
station 51 and station 53 to and from station 52 without halving
our signal strength. Also included in this process would involve moving
the radios at station 53 from outside on the antenna to inside the station
through an already-in-place conduit. We will also need to place an
additional directional antenna on the tower at station 53 to directly beam
signal to and from station 52, instead of having to go through station 51
and it be rebroadcast. Along with some surge suppression equipment, cable,
and labor, this solution has a proposed cost of $14,995.00.
- The above solution
proposal has some limitations. This will take care of the immediate signal
strength problems and bring us back up to the initial starting point of
11mbs/second speed. What it does not take into account is the future
growth and expansion of our system or the interference problems that occur
with other network users in the area. We are very hopeful that we be able
to install next year a fully interactive audiovisual telecommunications
package from our FEMA/ODP Fire Act Grant. If we are successful in this
endeavor, we will be able to use our current wireless system to send and
receive live, real-time video signals between the stations, but that will
require more bandwidth. This will potentially put a strain on the system
in terms of speed. Additionally, as the department continues in its
projected growth, we can foresee an additional station and perhaps a
separate headquarters and/or training center. As these future growth sites
become operational, they will have to be placed into the network, as well.
We feel that now is
a good time to be proactive and meet our needs for not just today, but the
rapidly approaching future and upgrade our system with a state of the art
network system that can accommodate this future expansion. This will include
four (4) new, more powerful radios on a totally different radio spectrum that
eliminates the possibility of out-of-the-system interference. It will also
increase our wireless network system speed to 54 mbs/second. This will allow
almost instantaneous signal transmission between the computers in the system,
allowing our personnel to be more productive and efficient in the use of their
time. With each of the new radios, we will also get new antennas installed on
our existing towers at each station. With this, will also come surge
protection, as well as moving the radios from the outside tower at station 53
to the inside of the building. The proposed cost of this system upgrade is
$27,135.00.
At first glance, this may seem a bit exorbitant. But
under closer examination, you can see that the price difference between the two
(2) proposals is just $12,140.00. This is less than half again the cost of the
proposal that would only bring us back to where we started. The good news is that after close examination
of the current budget, we have approximately $20,000 available as other
projects and expenditures have come in under budget. With the appropriation of
the other approximately $7,000.00 by the Board, we can upgrade our system now
instead of in the future when costs are sure to escalate. We feel that this is
a wise use of our current funds and would like for the board to approve the
system upgrade for $27,135.00
Thank you.