- Station
52 repairs update.
- All
repair work is FINALLY DONE!!
- We
have received a verbal report from Don Courteu certifying the completion,
but to our knowledge has not produced a written document.
- Station
53 septic issues.
- Chief
Brown is still working with Earthek to get the situation resolved. We have since had a water main break
which complicated the matters by potentially damaging the wiring to a
component on the system. Chief
Brown should have more on this at the meeting.
- Policy
manual update.
- It
is now complete. The entire
manual can be viewed on the website by going to the employee page and
clicking on “Policy Manual”.
- Tactical
unit update.
- Committee
still working on project and really no new news to report.
- Original
specifications review resulted in costs for the truck being higher than
originally anticipated. The
committee is re-evaluating the spec to find anything that could reduce
the project cost.
- Current
financial update.
- 2003
Fire Loan
1)
Chief Tibbetts has been working on different options for our
2003 fire loan. Included in this would
be land acquisition for future fire stations.
He is currently getting prices for land at various locations throughout
our district.
2)
Other potential projects include building renovations,
extrication tool replacement, and computer system (our current one is 3 years
old and now out of warranty).
- ‘04
Budget update.
1)
As we all know it is finally finished and has been advertised
at the $3.99 Million total with the intention we will appeal the state later
this year. We have also BALANCED the
‘fall-back’ budget at $2.3 Million.
Thanks to everyone for his or her help as this was not an easy process.
- The
minutes from the July 1st District meeting are available for viewing on
our website, or by following this link:
http://www.wrtfd.org/downloads/minutes/fpdb/2003/0701.htm
- The
August newsletter is available for viewing on our website, or by following
this link:
http://www.wrtfd.org/downloads/newsletters/Aug03news.doc
CURRENT PROJECTS
Chief Tibbetts
|
* 2003 fire loan.
|
Chief Cassin
|
* Policy updates.
|
Tactical Committee
|
* Looking for ways
to reduce project costs.
|